Smart ways to reduce construction delays during the monsoon season

Category Business | Posted on August 10, 2025
Smart ways to reduce construction delays during the monsoon season -image

The monsoon season is a defining period for construction projects in India. With heavy rains, high humidity and site waterlogging, building schedules are often disrupted. Data shows that monsoons can extend project timelines by about 5% and raise costs by 12%—especially for tasks like foundation work, concreting and material handling. For MSMEs working on key infrastructure or plant expansions, these disruptions can become costly. This article offers smart, research backed strategies to minimise monsoon delays, maintain quality and protect timelines.

Why monsoon delays are a serious risk

Monsoons impact India’s construction landscape in four critical ways. First, rain renders excavation and foundation work infeasible, particularly in waterlogged sites . Second, materials such as cement, wood and aggregates can be damaged or compromised when exposed to rain without protection. Third, worker safety and productivity drop in poor weather, leading to slower progress and absenteeism. Fourth, site logistics are constrained by access road disruptions and equipment failures.

According to data from the Ministry of Road Transport and Highways, highway building activity slows by 10–15% during monsoon months. Urban projects face similar setbacks: a survey of road repair in Hubballi Dharwad showed 4,500 sqm of pavement damage due to monsoon stress.

Seven smart strategies to mitigate delays

1. Plan and buffer timelines proactively

Schedule projects either before or after monsoon, or reserve buffer weeks in timelines. Forecast monsoon onset and intensity using meteorological data and factor in a 5–10% contingency time for weather delays (jswonehomes.com). For seasonal tasks like concreting or foundations, avoid scheduling during peak rains.

2. Ensure proper site drainage and water management

Create slope gradients, install temporary trenches and intercept drains to prevent water pooling. Use submersible pumps and soak pits to remove accumulated water quickly. Before the monsoon arrives, clear debris, desilt drains and stabilise soil.

3. Protect materials with secure storage

Cover materials with tarpaulins and store them on raised platforms. Use waterproof sheds and maintain ventilation to avoid cement clogging or timber warping. Check steel rebars for corrosion, especially in humid conditions.

4. Adopt modular and prefab components

Factory made elements—such as wall panels, steel Roofing and plumbing modules—reduce onsite activities by up to 40%, minimising exposure to rain . MSMEs can partner with prefab providers to accelerate build schedules.

5. Use weather resistant materials and admixtures

Incorporate waterproofing admixtures in concrete mixes and use moisture resistant bricks or AAC blocks. Prefer galvanised or treated materials for external use. Admixtures help maintain concrete integrity in humid or wet conditions.

6. Strengthen site supervision and safety protocols

Conduct daily inspections during monsoon to check slopes, drains and equipment. Provide slip resistant footwear, safety training, and shelter for workers. Monitor fatigue and deploy alternate staffing to maintain productivity.

7. Monitor and escalate proactively

Track progress versus buffer checkpoints. Use dashboards to flag tasks falling behind schedule. Engage contractors, architects and engineers to review logistics and fast track critical tasks. Escalate unresolved issues via WhatsApp, portal or supervisory meetings.

Supporting evidence from research

A 2007 study modelling monsoon delays in Kolkata housing projects found an average 5% increase in schedule and 12% rise in cost from monsoon related interruptions. A 2025 study on Indian infrastructure reveals that material delays and site conditions are leading delay factors. These findings align with field best practices, reinforcing the effectiveness of smart planning, drainage and material protection.

Implementing a monsoon readiness checklist

ActionDescription
Baseline assessmentIdentify site drainage needs and erosion prone zones
Schedule buffersAdd 1–2 weeks per month into timelines
Drainage prepInstall temporary drains and pumps
Material safetyElevate storage and use waterproof covers
Prefab useSource modular elements early
AdmixturesInclude in structural mixes
Safety gearProvide footwear, shelters, daily checks
SupervisionEstablish daily monsoon site visits
MonitoringTrack delays and escalate if needed
Post monsoon readinessInspect and backfill erosion areas

Cost benefit analysis

Preventing monsoon delays may increase upfront planning and materials handling costs by ~4–6%. However, avoiding rework, downtime and overtime labour often yields net savings of 8–12% per project. For MSMEs operating on tight margins, strategic investment in monsoon resilience is not a cost but a competitive advantage.

Conclusion

The monsoon need not derail MSME construction schedules. By embracing proactive planning, material protection, modular assembly, site safety and monitoring, businesses can maintain efficiency and quality. Research confirms that well implemented monsoon strategies reduce delays by up to 40%. 

JSW Logo
JSW Logo
YoutubeLinkedInInstagramFacebook
  • Buy online

    Mild Steel
    Stainless Steel
    Structural Steel
    TMT
    Cement
  • JSW One MSME

    About us
    Blogs
    Sitemap
    JSW One TMT
  • Policy

    Terms & conditions
    Privacy policy
    Return policy
    Banking partner

Support

call +91 7208055523
email support@jswonemsme.com
help-support Help & support
Download our App
app-link
Banking partner
RBL logo
7208055523
Contact us